Treatment 


Evoca decking is preservative treated with a new generation, advanced water-borne preservative. This new preservative provides the same long term resistance to termites mould and rot as traditional wood treatments but is free from components considered harmful to health and the environment.


 

Finishing


Evoca engineered bamboo decking comes precoated with Cutek Extreme Goldtone.
 

Evoca engineered bamboo must be regularly coated with Cutek Extreme to ensure durability and to avoid mould.
 
Note: In order to be covered by the Evoca performance guarantee, Evoca must be maintained with regular applications of Cutek Extreme with colourtones added as the colourtone gives the Evoca added UV protection in the harsh Australian climate.


Evoca that has been supplied in its precoated form should have a second coat applied within a month of installation. 
 

Cutek Extreme  is easy to apply but care should be taken to apply it sparingly and according to the instructions on the label. Recoat as necessary to maintain original appearance. Depending on the location and climate the re-application frequency required is approximately twice a year. 

Note: Any colourtone colour can be applied over the Goldtone pre-coat and with each successive coating the colour will build up. A bolder colour will take a few applications over the first year to build up the colour level. This is due to the fact that only small amounts of colour can be laid down with each application. The decking is very smooth when new and thus limits the colour particle numbers. When the decking has weathered from 6 to 12 months, it becomes rougher and more colour will flow into the surface
 

The guarantee offered on the performance of Evoca does not cover natural aging, 'silvering' or 'greying off'.  We strongly advise against the use of any other stain or coating on Evoca decking other than Cutek Extreme. Coatings that form a surface film-build can cause premature staining and failure resulting in an unsightly mould-like appearance.
 

We cannot guarantee the quality of Evoca unless it is maintained with regular applications of Cutek Extreme.


For further technical information regarding Cutek Extreme please visit www.chemisys.com.au



Do's and Don'ts


Evoca Decking Care and Maintenance


Evoca decking requires regular care and maintenance.


Note: In order to be covered by the Evoca performance guarantee, Evoca must be maintained with regular applications of Cutek Extreme with colourtones added. 

Evoca that has been supplied in its pre-coated form should have a second coat applied within a month of installation.  Evoca supplied not pre-coated should be coated prior to installation, and again within a month of installation. Depending on the location and climate the re-application frequency required is approximately twice a year.


Suggested steps in preventative care and maintenance of your Evoca deck:

  • Install properly with gaps between boards and correct pitch away from building to assist with drainage and drying.
  • Avoid the use of bark or mulch around, on or under the deck.
  • Keep the area under the deck well ventilated and free from materials that retain moisture.
  • Avoid overspray of plant fertilizers.
  • Place BBQs and grills over a large mat so that splashes and spills can be avoided.
  • Avoid constant dripping from sitting or hanging planters.
  • Surface staining and mould can and will grow in any surface in full exposure to weather, bamboo is no different. Customers need to be aware that they need to clean any effected areas ASAP with SaraClean, ProClean or other suitable wood cleaner see www.chemisys.com.au for more details.
  • Small degrees of surface and end checking will always occur with bamboo and all wood decking. It would be helpful if customers were aware of this fact so they don't start to panic.

Recommended cleaning methods:

  • Regularly sweep to remove dust and organic matter.
  • We do not recommend high-pressure washing or water blasting.
  • Washing down with a mild detergent solution once a year if required is an acceptable method of cleaning, especially prior to reapplying CD50 Extreme.
  • Surface staining and mould can and will grow in any surface in full exposure to weather, bamboo is no different. Customers need to be aware that they need to clean any effected areas ASAP with SaraClean, ProClean or other suitable wood cleaner see www.chemisys.com.au for more details.


Guarantee 

 

 

  • 10 years protection against de-lamination, rot and termite attack. 

To see the full guarantee document, click here.


 

MSDS


Section 1: Product and Company Identification

Product: Evoca Engineered Bamboo Decking
Distributor: Buildpro Ltd ABN 91 853 063 150
Preparation Date: March, 2007


Section 2: Composition, Information on Ingredients

Bamboo Fiber: 60-70%
Phenolic Resin: 30-40%


Section 3: Hazards Identification

In normal use, the product is not hazardous. However, this product may be cut or finished in ways which produce bamboo dust fibres. Certain bamboo fibres are considered hazardous if the airborne concentration exceeds the OSHA or ACGIH exposure limits for long periods of time. Exposure to such fibres is considered unlikely with this product; all sawdust in the board is fully stabilized inside of the bamboo fibre organization.


Section 4: Emergency and First Aid Procedures

Inhalation: This material is not expected to present an inhalation hazard.
Eyes: Flush sawdust or fines from eyes with water; if irritation occurs, obtain medical attention.
Skin: This material is not expected to present a skin contact hazard.
Ingestion: No adverse effects expected from ingestion.


Section 5: Fire and Explosion Data

Flash Point: Greater than 650ºF.
Upper Explosive Limit: Not Determined
Lower Explosive Limit: Not Determined Auto Ignition
Temperature: Estimated to be greater than 650ºF.
Extinguishing Media: Dry Chemical, Water Fog, Foam, Carbon Dioxide. Special Fire Fighting Procedures: Dense smoke emitted when burned without sufficient oxygen. Possible dust explosion if fines accumulate. Wear standard fire fighting attire (as for fighting a wood fire), including SCBA gear in enclosed areas.

NEPA Hazard ID: Health: 0 Flammability: 1 Reactivity: 0

 

Section 6: Spills and Disposal Procedures

Land Spill: Material should be swept up and discarded.Water Spill: Clean up and discard or reuse.Waste Disposal: Dispose of in accordance with local regulations. No special procedures required. 
 

Section 7: Handling and Storage Handling

Evoca has a density of 690kg per m3. Lift carefully.Storage: Support every 600mm on a flat surface. Store away from strong oxidizing agents and combustible materials.
 

Section 8: Protective Measures

Ventilation: Use in well ventilated area.Respiratory Protection: An approved respirator may be needed in areas with a high accumulation of fines.Eye protection: Wear safety glasses with side shields when sawing or installing.Skin protection: No special precautions needed.
 

Sectioin 9: Physical Data Appearance and Odour

Odour: Slight Bamboo fibre odour.
Solubility in Water: Insoluble
Vapour Pressure: Negligible
Melting Point: 275-350F
Vapour Density: NA
Percent Volatile: Negligible


Section 10: Reactivity Stability

This material is stable. Conditions to Avoid: Heat and flameMaterials to Avoid: Strong oxidizing agents Combustion Products: Hazardous Polymerization: Will not occur.The following combustion products may be generated: carbon dioxide, carbon monoxide, water vapour, trace  VOC's, Formic Acid, Acetic Acid.


Section 11: Toxicological Data

Exposure Limit of Material: Not established LD50 (lethal dose) of material not established.
Carcinogenetic Material: None (bamboo dusts are fully stabilized inside the bamboo fibre organization)

 

Section 12: Ecological Considerations

This material has not been tested for environmental effects. (But is not considered hazardous)


Section 13: Disposal Considerations

Dispose of as normal refuse.


Section 14: Transport Information

This material is not regulated by transport regulations.
NEPA Hazard ID: Health: 0 Flammability: 1 Reactivity: 0


Section 15: Regulatory Information

WHMIS Classification: This is not a controlled product. This material is not hazardous by OSHA Hazardous Communication Standard 29 CFR 1910.1200.  This material is not subject to specific CERCLA, California Safe Drinking Water and Toxic Enforcement Act (Proposition 65) or SARA 313 reporting requirements.

To the best of our knowledge the information contained in this Material Safety Data Sheet is accurate.  However, neither Buildpro Ltd nor any of its affiliates makes any warranty, expressed or implied, or accepts any liability in connection with this information or its use.